Hongyuan County recently saw its first snowfall of winter, with temperatures dropping to -4℃. The solar mounting system project team maintained operations by implementing anti-freezing measures, optimized construction plans, and enhanced safety inspections. Adopting two-shift rotations, workers ensured both installation accuracy and timeline targets while safeguarding health conditions. Their dedication in harsh weather demonstrates professional commitment, driving steady progress for this plateau-based renewable energy initiative.